A public e-bike service has been implemented, featuring a charging station for 24 units located next to the former “Virgen del Pilar” Hydroelectric Power Plant, in the natural surroundings of the Tajo River.
What it offers
- 24 electric bicycles available for all users.
- Fixed charging station with secure anchoring and capacity for simultaneous charging of all 24 bikes.
- An ideal starting point for routes connecting green corridors, natural landscapes and tourist areas.
E-bike features
- 250 W motor and integrated long-range lithium battery.
- Three levels of pedal assistance.
- 27.5″ to 29″ wheels with tires suitable for paths and trails.
- Ergonomic frame adaptable to different heights.
- Front and rear brakes, adjustable saddle and non-slip pedals.
Benefits
- Sustainable mobility and reduced environmental impact.
- Active tourism experience to discover natural and cultural heritage (Tajo River, Isla de los Molinos and natural pathways).
- An accessible, modern and healthy option for both residents and visitors.